chinese

chinese
Your current location : home >> News >> Company News

News

PRODUCT/ PRODUCT

Installation of pulley bearing

Release date:2022-03-29 author: click:

Installation of pulley bearing

Installation of fixed end front bearing on the shaft: thoroughly clean the bearing with clean cleaning kerosene. For grease lubrication, first inject the organic solvent containing 3% ~ 5% grease into the bearing for degreasing and cleaning, and then fill the quantitative grease into the bearing with an oil gun (accounting for 10% ~ 15% of the bearing space volume). 

bearing

Heat the bearing to raise the temperature by 20 ~ 30 ℃, and install the bearing into the shaft end with an oil press; Press the set sleeve on the shaft and press the bearing end face with appropriate pressure to make it axially positioned; Roll the belt of the spring scale on the outer ring of the bearing and check whether the specified preload changes greatly by measuring the starting torque (even if the bearing is correct, the preload may also change due to  bearing   the deformation of the fit or cage).


Article website:http://en.yifenbei.cn/news/995.html

key word:Showerroompulley,Silentantirustbearinginshowerroom,Refrigeratorantirustpulley

contact

Fax:0757-85916365  Mobile: 13434850733

URL: www.yifenbei.cn 

Address: Foshan Nanhai District Lishui Town Deng Gang North Corner Channel No. 6 4 floor

License


未标题-28.png

Sweep and pay attention

to the official website of 

the mobile phone

  • Service
  • number
    13434850733
  • Message
  • Online Service
    Please leave a message for us
    Please input the message here, and we will contact you as soon as possible.
    name
    Contacts
    Telephone
    Telephone
    mailbox
    mailbox
    address
    address